Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Train Delays No More

Railway Traffic Optimisation

End the Delays

90% less severe delays. Save up to 0,52 €/train-km in operating costs.

Save Energy

10% more energy efficiency. Save up to 0,32 € /train-km in energy savings.

More Trains

40% more trains on tracks. Up to 8,56 €/train-km more operating income.

Disruption Recovery in sub-Second

WEIVI solves the optimal traffic disruption recovery plans for reasoned decision making and recovery implementation. It computes updated schedules, locations and velocity profiles based on real-time information about events and disruptions.

Carbon Emission Management

WEIVI can evaluate environmental impact of railway traffic in terms of CO₂ emissions.

Energy Optimisation

WEIVI optimises train velocities based on train physics and updated schedules, ensuring minimal energy consumption.

Easy Network Import

WEIVI is compatible with any traffic control standard or traffic management system.

Functionalities

Optimisation in Disruptions

WEIVI computes the optimal operational plans for the trains and updates schedules, locations and velocities based on real-time train traffic data and information about events and disruptions.

Train Connectivity

WEIVI includes the interdependencies between trains (e.g., connecting trains that are operated with the same rolling stock). Accurate train physics with, e.g., railway’s vertical geometry ensures realistic simulations including interactions with control and signalling systems.

User control

WEIVI allows careful manual event and issue adjustment for traffic controllers. Moreover, adjusting simulation environmental parameters like flow of simulation time and returning to past events is possible. It also supports selection of parameter weights in optimisation value function.

Assisting system

WEIVI enhances human decision making in TMS-systems.

Schematic view of WeiviEngine optimisation results on current simulational test environment with real train data and infraAPI integration. The real time traffic data on the same (Joensuu – Imatra) route can be found, e.g., on Juliadata web page.

Predictive Digital
Twin Technology

WEIVI’s technology stands out by pioneering unique predictive features that enhance the simulation capabilities of digital twins. Predictive digital twins are optimal in solving complex traffic management problems efficiently.

Train Physics

WEIVI’s advanced train physics produces accurate velocity profiles that can be used even in autonomous train driving. It can utilise vast group of parameters including vertical geometry and curvature of tracks, effects of weather and ballistic coefficients of trains.

I/O Integration in JSON Format

  • Compatible with infra-API -data
  • Future Proof: Compatible with all ERTMS- and ETCS-systems.
  • Inputting schedule and rail infrastructure data.
  • Inputting disruption, control and signalling system, and real-time traffic data.
  • Interdependencies between trains.
  • Outputs: changes in schedules, operational plans and simulated traffic data.

Graphical User Interface (GUI)

Depicts the traffic and forecasts as a graphical timetable. Allows for easy adjustments and manual inputs, ensuring the optimisation software can be used even without real time traffic data. Also makes it possible to test infrastructure models and timetables to plan and evaluate the effects of infrastructural implementations. The graphical user interface (GUI) acts as an input/output (I/O) interface.